2,435 wind, solar, storage, biomass and hydro projects of 1 MW and up in Great Britain: 1,880 in the pipeline (534.8 GW planned, consented or under construction) and 555 in operation (81.6 GW). Source: Arcadium Data, data as of .

Use it through the API License the full dataset

Projects by stage

StageProjectsCapacity
Planned (scoping or in planning)1,625497.5 GW
Consents approved21930.0 GW
Under construction367,320 MW
In operation55581.6 GW

Largest projects in the pipeline

ProjectTechnologyStageCapacityExpectedWhereOperating company
Bute Hydrogen Project 1gasPlanned (scoping or in planning)4,800 MW2035-10-30National Grid Electricity TransmissionHALDANE ENERGY PROJECT 1 LIMITED
Drax BECCSBiomassPlanned (scoping or in planning)3,906 MW2035-10-30National Grid Electricity TransmissionDrax Power Limited
Bute Hydrogen Project 2gasPlanned (scoping or in planning)3,600 MW2035-10-30National Grid Electricity TransmissionHALDANE ENERGY PROJECT 2 LIMITED
Bute Hydrogen Project 3gasPlanned (scoping or in planning)3,600 MW2035-10-30National Grid Electricity TransmissionHALDANE ENERGY PROJECT 3 LIMITED
Bute Hydrogen Project 5gasPlanned (scoping or in planning)3,600 MW2035-10-31National Grid Electricity TransmissionHALDANE ENERGY PROJECT 5 LIMITED
Bute Hydrogen Project 6gasPlanned (scoping or in planning)3,600 MW2037-10-30National Grid Electricity TransmissionHaldane Energy Project 6 Limited
PortwindSolar PV + Offshore wind + Battery and other storagePlanned (scoping or in planning)2,500 MW2036-12-06National Grid Electricity TransmissionSE PORTWIND LTD
Bute Hydrogen Project 4gasPlanned (scoping or in planning)2,400 MW2035-10-30National Grid Electricity TransmissionHALDANE ENERGY PROJECT 4 LIMITED
Bute Hydrogen Project 7.1Battery and other storagePlanned (scoping or in planning)2,400 MW2038-10-31National Grid Electricity TransmissionHALDANE ENERGY PROJECT 7 LIMITED
Machair Offshore Wind FarmOffshore windPlanned (scoping or in planning)2,000 MW2033-09-16SP TransmissionSCOTTISHPOWER RENEWABLES (UK) LIMITED
Walpole Flexible GenerationBattery and other storage + gasPlanned (scoping or in planning)2,000 MW2033-06-30National Grid Electricity TransmissionFLEXIBLE GENERATION 1 LTD
GallosOffshore windPlanned (scoping or in planning)2,000 MW2036-12-06National Grid Electricity TransmissionCorio Generation Limited
Berwick Bank Offshore Wind Farm COffshore windPlanned (scoping or in planning)1,800 MW2029-11-30National Grid Electricity TransmissionBERWICK BANK C LIMITED
Damhead Creek 2Battery and other storage + gasConsents approved1,800 MW2030-10-31National Grid Electricity TransmissionVPI Power Limited
Carrington Lane BESSBattery and other storagePlanned (scoping or in planning)1,800 MW2037-10-30National Grid Electricity TransmissionApatura Battery Ltd
ARVEN OFFSHORE WIND FARMOffshore windPlanned (scoping or in planning)1,800 MW2033-10-31SSEN TransmissionARVEN OFFSHORE WIND FARM LIMITED
Glen Earrach PSHBattery and other storagePlanned (scoping or in planning)1,800 MW2035-10-31SSEN TransmissionGLEN EARRACH ENERGY LIMITED
North-East Offshore Hybrid AssetOffshore wind + interconnectorPlanned (scoping or in planning)1,800 MW2037-06-30SSEN TransmissionNational Grid Interconnector Holdings Limited
NatPower Enderby - Patford Bridge Green Energy ParkBattery and other storagePlanned (scoping or in planning)1,799 MW2037-10-30National Grid Electricity TransmissionENDERBY ENERGY LIMITED
GT R4 Offshore Wind FarmOffshore windPlanned (scoping or in planning)1,500 MW2030-11-30National Grid Electricity TransmissionGT R4 LIMITED
Mona Offshore Wind FarmOffshore windPlanned (scoping or in planning)1,500 MW2029-10-31National Grid Electricity TransmissionMona Offshore Wind Limited
Morven A Offshore Wind Farm (Prev Phoenix 1A)Offshore windPlanned (scoping or in planning)1,500 MW2031-10-31National Grid Electricity TransmissionMorven Offshore Wind Limited
Phoenix 1B Offshore Wind FarmOffshore windPlanned (scoping or in planning)1,500 MW2033-10-31SP TransmissionMorven Offshore Wind Limited
Morgan Offshore Wind FarmOffshore windPlanned (scoping or in planning)1,500 MW2029-11-30National Grid Electricity TransmissionMorgan Offshore Wind Limited
HavbredeyOffshore windPlanned (scoping or in planning)1,500 MW2033-10-30SSEN TransmissionHAVBREDEY LIMITED

Operating companies

Operating companyProjectsCapacity
TELIS ENERGY UK LIMITED1817.1 GW
RWE Generation UK Plc148,686 MW
Lightsource Renewable UK Development Limited358,537 MW
Drax Power Limited27,812 MW
EDF Energy Nuclear Generation Limited46,040 MW
SSE DE SOLAR HOLDCO LIMITED95,400 MW
Uniper UK Limited95,358 MW
QAIR RENEWABLES UK LIMITED245,320 MW
SCOTTISHPOWER RENEWABLES (UK) LIMITED315,271 MW
Bluestone Energy Ltd195,170 MW
HALDANE ENERGY PROJECT 1 LIMITED14,800 MW
Keadby Generation Limited54,515 MW
Apatura Battery Ltd134,370 MW
KARI ENERGY LIMITED44,000 MW
RWE Renewables UK Solar and Storage Limited113,965 MW
VPI Power Limited43,787 MW
ER PROJECT DEVELOPMENT CO LIMITED103,770 MW
BSR APPLICATIONS LIMITED123,720 MW
548 UK INVESTMENT HOLDINGS LIMITED113,650 MW
Renewable Energy Systems Limited133,610 MW
ENSO GREEN HOLDINGS X LIMITED93,600 MW
HALDANE ENERGY PROJECT 2 LIMITED13,600 MW
HALDANE ENERGY PROJECT 3 LIMITED13,600 MW
HALDANE ENERGY PROJECT 5 LIMITED13,600 MW
Haldane Energy Project 6 Limited13,600 MW

By technology

Projects of 1 MW and up. Capacity is net nominal capacity (Germany) or the total capacity of the queue entry (Great Britain). A hybrid project counts under each technology it lists. Companies only: private persons are never shown as operators, and no coordinates or street addresses are published. Data as of 2026-10-25, updated monthly.

Germany: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland - Namensnennung - Version 2.0 (www.govdata.de/dl-de/by-2-0). Great Britain: Supported by National Energy SO Open Data (NESO Open Data Licence, TEC register and Embedded register).

Questions

Where does this data come from?

Great Britain: the NESO Transmission Entry Capacity register and Embedded register. We load the official files, keep projects of 1 MW and up and record changes between loads.

Does the list show private owners?

No. Operators are shown only when they are companies. Private persons, sole traders and names that could belong to a person are left out, and the data holds no coordinates or street addresses.

How often is it updated?

Monthly. Each load records new projects, changes of stage, capacity or connection date, and projects that left the register.

Cite as: Arcadium Data, "Grid-connection and renewable project pipeline in Great Britain: 1,880 in the pipeline, 534.8 GW", https://arcadiumdata.io/energy/gb/, data as of 2026-10-25.